World Cup Goals Record ‘Just A Number’, Says Messi
Preparation Afoot For Full Operation Of Nagdhunga Tunnel From Mid-July
Iran War Is A Wake-Up Call For Southeast Asia’s Energy
Researchers Develop Low-Calorie “Rare Sugars” Using Engineered Bacteria
Work Begins On Largest-Ever Pipeline To Expand Melamchi Water Distribution
TU Directs Professors, Staffs To Report Within 15 Days
‘OTT Platform’ Now Comes Under Legal Radar; Registration And Permission
Do Not Download Unnecessary, Suspicious Apps: Nepal Police
Gaza Tailor Turns Waste Fabrics Into Dresses For Girls
Kathmandu, May 14: The vehicular movements along the Kavre-Sindhuli section of the BP Highway and the Hilsa-Simkot road section in Humla district have been closed, citing possible threats of flooding and ongoing road construction works. Issuing a notice this morning,
Traffic Along BP Highway
Temporary Road Being Constructed
BP Highway: Vehicular Movement
Govt To Accept Japanese
BP Highway To Remain
Vehicular Movement Banned On
BP Highway Resumes After